VectorVue Documentation

Integration, platform operations, architecture, and assurance references

Phase 9 Sprint 9.1 - Red Team Validation Architecture

Summary

Added a dedicated red-team simulation suite as a release-gating security control within CI.

Threat Model

Attack Vectors Considered

Mitigations Implemented

Residual Risk

Future Improvements

Architecture Diagram

flowchart LR
  C[Candidate Change]
  CI[Security Enforcement Workflow]
  RT[Phase 9.1 Red-Team Simulation Suite]
  G1[Telemetry Security Controls]
  G2[Tenant Isolation Controls]
  G3[Tamper Log Integrity Controls]
  BLOCK[Promotion Blocked]
  PASS[Promotion Eligible]

  C --> CI
  CI --> RT
  RT --> G1
  RT --> G2
  RT --> G3
  G1 --> BLOCK
  G2 --> BLOCK
  G3 --> BLOCK
  RT --> PASS